Lecture Hall Building Y

The new Lecture Hall Building Y is being built just a few metres from the main university building. A lecture hall with about 650 seats and three seminar rooms will be erected in the direct vicinity of Building Z. The construction of the new Lecture Hall Building will create additional space for teaching. During the modernisation measures of the first construction phase, the Audimax in the main university building will only be available until the beginning of 2020. The new Lecture Hall Building was planned as the University could not do without its largest lecture hall for an extended period of time. In addition, the University also has a need for additional teaching space in the long term.

Completion date Q3 2021
Main usable area 940 m²
Lecture Hall 1 (650 Plätze)
Seminar rooms 3
Building owner Bielefeld University
Overall costs about 13,3 Million Euros
  • Energy standard: BEG 100 (complies 100% with the requirements of the EnEV or GEG).
  • Building material: over 10 tons of steel and 200 m³ of wood
  • Energy source: electricity mix, natural gas
  • Energy generation: Heat pump & condensing boiler (natural gas)
  • Type of ventilation: ventilation system with heat recovery
  • Energy generation: PV system (24.5 kWp)
  • The new lecture hall building Y has been opened
    Photo: Bielefeld University
    September 2021: After just under two years of construction, the new lecture hall building Y has been opened.
  • Start of work on the outdoor facility
    Photo: Bielefeld University
    May 2021: The scaffolding is dismantled and work on the outdoor facilities can begin.
  • View of the consequence, the new lecture hall building between building Z and ExPhy
    Photo: Bielefeld University
    October 2020: View of the consequence with the new lecture hall building between building Z and ExPhy
  • A supporting beam of the building is held above the shell by a crane.
    Photo: Bielefeld University
    June 2020: The first of a total of twelve metre-long supporting beams weighing several tonnes hovers above the shell of the lecture hall building.
  • Shell construction and a crane in the background
    Photo: Bielefeld University
    February 2020: The shell of the auditorium building is progressing.
  • aerial photo of the main building with a mark at the places where the building Z and the Lecture Hall Building will be
    Photo: Bielefeld University
    The new Lecture Hall Building will be built on ‘Konsequenz’ street
  • Four models for the new building at the architecture contest
    Photo: Bielefeld University
    Architecture contest in May 2018: The Jury picked four favourites.
  • architect, Chancellor and Rector in front of the winning design
    Photo: Bielefeld University
    August 2018: Chancellor Dr. Stephan Becker (left) and Rector Professor Dr. -Ing Gerhard Sagerer (right) present together with the architect Roland Bondzio (centre) the winning design
  • Digital visualization of the new Lecture Hall Building with a light facade and a big window facade
    Photo: Behet Bondzio Lin
    Light and modern: This is what the new Lecture Hall Building will look like
  • Digital Visualization of the lecture hall
    Photo: Behet Bondzio Lin
    The planned lecture hall will accommodate 700 students.
  • Digital Visualization of the entrance
    Picture: Behet Bondzio Lin
    A lavish entrance hall will welcome visitors into the building.
  • Groundbreaking Ceremony with the Chancellor and the Vice-Rector
    Photo: Bielefeld University
    Chancellor Stephan Becker and Vice-Rector Prof. Dr. Claudia Riemer (from left) celebrate the groundbreaking ceremony for the construction of the new lecture hall Y.
  • Groundwork for the new Building
    Photo: Bielefeld University
    November 2019: The groundwork is in full swing.