skip to main contentskip to main menuskip to footer Universität Bielefeld Play Search

Master’s degree programmes

© Universität Bielefeld

Bioinformatics and Genomics (M.Sc.) (To be discontinued from the 26/26 winter semester)

Please note: The M.Sc. in Bioinformatics and Genomics (120 LP, standard duration of study: 4 semesters) was discontinued with effect from the 2025/2026 winter semester in favour of consolidation into the MSc in Natural Sciences Informatics (NWI), as explained in the phase-out provisions.

Students in the laboratory
© Bielefeld University

The Faculty of Technology at Bielefeld University, comprising the Departments of Information Technology and Biotechnology, is a hub for interdisciplinary research. Bioinformatics and biotechnology collaborate with biomathematics, Molecular Biology, biochemistry and nanophysics in genomics research, in the investigation of single-molecule processes, and in the application of the findings to biotechnological production. Cognitive Informatics collaborates with linguistics, behavioural and neurobiology, cognitive psychology and Sports Science. The aim of this collaboration is to develop intelligently acting and communicating robots, virtual agents and semantics-based web and information systems.
The Faculty of Technology is a key sponsor of various research institutes at Bielefeld University – CeBiTec - Center for Biotechnology, CITEC (Centre for Cognitive Interaction Technology) and CoR-Lab (Research Institute for Cognition and Robotics). The faculty’s interdisciplinary focus is also reflected in its teaching. No ‘pure’ computer science master course is offered.

master course

Prospective students are now being offered a programme equivalent to the M.Sc. in Bioinformatics and Genomics as part of the M.Sc. in Computational Science (NWI). This Master’s programme is already being expanded to include a Bioinformatics specialisation in order to make the qualification achievable explicitly visible – students will then be able to transfer to the version of the programme that has been updated with the relevant specialisations.

International Exchange and Collaboration

Students are offered various opportunities to gain experience abroad and develop intercultural skills. The Erasmus+ programme takes them to universities across Europe; in addition, Bielefeld University maintains international collaborations and partnerships with higher education institutions on every continent. The International Office provides advice on all matters relating to choosing a place of study, scholarships for studying abroad and the application process.

Study Programme Guide

Network diagram

On Bielefeld University’s central study information pages (Department of Education and Teaching), you will find details of the modules offered for this degree programme in the electronic course catalogue (ekvv), a link to an overview of introductory and orientation events, information on the course start, length and scope of studies, approval requirements, application, admission and enrolment, examination und study regulations, and the subject-specific regulations for the degree programme.

Further information on applications, admission and enrolment can be found on the Student Registry’s website.

The aim is to provide students with a sound understanding of the algorithmic and experimental methods used to acquire, store, process, visualise and analyse biological data. In addition to teaching fundamental techniques, the course content focuses on current issues in genomics research and the computational problems they raise. Furthermore, students are increasingly guided towards independent work in accordance with the scientific principles of bioinformatics and genomics research: this trains their ability to contribute to open research questions. This includes devising and carrying out novel experimental protocols. In the field of computer science, existing algorithms are to be evaluated with regard to novel data or research questions, and new algorithms of appropriate efficiency are to be developed. Furthermore, students are trained in the use of English-language literature and are given the opportunity to gain work experience in an international context.

There is a high demand for bioinformaticians with interdisciplinary training, both in biological, chemical, pharmaceutical and medical research and in the corresponding sectors of industry and services. Research fields based on high-throughput techniques in genomics – and which consequently require extensive bioinformatics expertise – are being established at many universities and research centres. Demand for this qualification is also continuing to rise in industry, meaning that there are currently good career prospects. The master course leads to a professionally qualifying degree for careers in both academia and industry.

A PhD is particularly relevant for students who wish to pursue an academic career after completing their Master’s degree. It serves to further innovative research and consists of an independent piece of academic research ((doctoral) thesis) and an oral examination (defence). To ensure the best possible support for doctoral studies, Bielefeld University is continuously expanding and strategically developing its extensive network of international and national Research Training Groups and structured doctoral programmes.

At the Faculty of Technology, students have the option of pursuing a doctoral degree independently or enrolling in the following doctoral programmes:

  • Bioinformatics
  • Intelligent Systems

In addition to the doctoral degree (Dr. rer. nat. or Dr.-Ing.) awarded by the Faculty, students on these doctoral programmes must complete an individual study programme. This includes both intensive academic supervision and a range of courses covering non-subject-specific skills such as presentation techniques, academic writing and career planning.

back to top